Stranded Power

The Distribution Layer · Curtailable connections

The best prospects in Britain already chose to be curtailed.

Transmission curtailment is a Scottish problem, 500 miles from the load. But there is a second, quieter curtailment market on the distribution network — generators who accepted a curtailable connection to get online fast instead of waiting years for reinforcement. They self-selected as willing to trade firmness for speed. And they sit in London, the South East and the East of England, where the demand already is.

Why this changes the map
39,570
Curtailment events published by UK Power Networks, site by site
UKPN Open Data, to 10 Sep 2026
Daily
Refresh cadence — event-level, not half-hourly aggregates
Updated 10 Sep 2026
3 of 6
DNO groups confirmed publishing site-specific curtailment events
UKPN · Northern Powergrid · SPEN
Invisible
None of this appears in the Balancing Mechanism — or in anyone else's analysis
Stranded Power assessment

Two curtailment markets, not one

Our transmission Index covers 134 wind farms losing 10.98 TWh a year — 99% of it in Scotland. That is the big number, and it is the wrong geography. The distribution layer is smaller per site and far better placed.

Transmission curtailment
(the Index)
Distribution curtailment
(this page)
Where it happens99% Scotland, behind the B4/B6 boundariesLondon, South East, East of England, North East, Yorkshire, Merseyside, North Wales
Why it happensNot enough wires south. National constraint.Local network congestion. The customer agreed to it.
Typical site size30 MW – 1,075 MWSub-MW to tens of MW
TechnologyWind only (BM-visible)Wind, solar, storage, generation of all kinds
Is the generator paid to stop?Yes — ~£26/MWh turn-down bidNo. They lose the revenue entirely.
Distance to major loadHundreds of milesOften minutes
Visible in the Balancing Mechanism?YesNo — which is why nobody has counted it

The row that matters most is the fifth one. A curtailed Scottish wind farm is compensated — it earns roughly £26 for every megawatt-hour it doesn't generate, which sets a floor under any private-wire price we can offer. A curtailed distribution-connected generator on a curtailable connection typically gets nothing. Its opportunity cost is zero. That makes the commercial conversation dramatically easier and the achievable spread wider.

The insight

These customers have already made the decision we're asking for.

UK Power Networks describes the arrangement plainly: when a generator wants a firm connection in a congested part of the network, the network may need reinforcing — which takes time and may cost the customer money. A curtailable connection lets them connect now instead, in exchange for accepting that their access can be restricted when congestion is high.

What they already chose

Speed over firmness

They looked at a reinforcement timeline and a reinforcement bill, and decided that connecting sooner with restrictions beat waiting for a firm connection. That is a documented, revealed commercial preference — not something we have to persuade them of.

What we're offering

Revenue on the restricted hours

A co-located load takes the output the network won't accept. The restriction stops costing them anything. It is the same trade they already made, extended one step — which is why this is the shortest sales conversation in the market.

Every other party approaching these generators is selling them a way out of curtailment: reinforcement, a firm connection upgrade, a battery to time-shift. All of those cost the generator money. We are the only proposition that turns the curtailment itself into income, and we are talking to people who have already signed a contract accepting it.

The data

What the DNOs publish, and what we do with it

NetworkDatasetRecordsLast updatedLicenceStatus
UK Power Networks
London · South East · East England
ukpn-curtailment-events-
site-specific
39,57010 Sep 2026
daily
CC BY 4.0Key required
Northern Powergrid
North East · Yorkshire · N Lincolnshire
curtailment-events-
site-specific
34811 Mar 2026NPG Open Data v1.0Key required
SP Energy Networks
Central/S Scotland · Merseyside · N Wales
spen_data_quality_
curtailment
———To assess
SSEN · ENWL · NGEDNo site-specific curtailment dataset found———Gap

The UKPN schema

der_name, der_name_act, public_flag — the site, and whether it has consented to be named event_id, scheme — the curtailment event and the managed scheme it sits under start_time_utc, end_time_utc, duration_hours total_der_access_reduction_kwh — access withdrawn average_access_reduction_kw, peak_access_reduction_kw estimated_energy_lost_kwh — the number that matters driver — why the network curtailed them

Northern Powergrid's equivalent adds geo_point_2d, geo_shape, site_class and licence_area — so their events arrive already geolocated and classified.

Honest status. Both datasets are real, current and verified — we have read the schemas and record counts directly from the publishers' APIs. Neither serves records without a registered API key, which is free but must be held by a named person. Until that is in place, this page describes the dataset rather than the findings. No figures on this page are estimated or modelled; every number above comes from the publishers' own metadata.

The analytical work — and the moat

UKPN's own data-governance assessment rates this dataset as publishable "with some restrictions", and mitigates privacy risk by securing DER agreement before naming customers. In practice that means many sites appear under an identifier rather than a name. For most users that makes the dataset frustrating. For us it is the entire opportunity:

  1. Resolve the anonymised. Cross-reference event patterns and scheme membership against capacity registers, planning records and connection data to name sites the raw file doesn't. Client deliverable.
  2. Rank by lost revenue, not lost energy. Distribution curtailment is uncompensated, so every kWh in estimated_energy_lost_kwh is revenue the generator never saw. That converts directly into a private-wire offer.
  3. Overlay the load side. An uncompensated curtailed solar farm within a few kilometres of an industrial estate or a stalled data-centre application is the most actionable pairing in the country. Client deliverable.
  4. Track the schemes. Curtailable connections cluster in named managed schemes. Whole clusters share a constraint — and a single co-located load can relieve several generators at once.

Anyone can download the file. Turning 39,570 anonymised events into a named, ranked, geolocated list of generators losing real money next door to real demand is a different exercise — and the output of it is released to engaged clients and subscribers, not published here.

What it changes

Three consequences for the business

1 · The addressable market roughly doubles

The transmission Index gives us 134 sites, of which 99 are commercially tractable. The distribution layer adds an unknown but substantial number of smaller sites across six licence areas — including solar, which the Balancing Mechanism cannot see at all. It also removes our single biggest weakness: that almost everything in the Index is in Scotland.

2 · The pitch gets simpler and stronger

No turn-down payment to beat, so no £26/MWh floor under our offer. No CfD basis-risk problem, because these are distribution-connected assets rather than CfD offshore giants. And a counterparty who has already signed a contract accepting curtailment in exchange for speed.

3 · The geography finally works

UKPN's three licence areas contain the London Docklands interconnection cluster and much of the South East — the densest electricity demand in Britain and the historic heart of its data-centre industry. A curtailed generator in Essex or Kent is a fundamentally more attractive private-wire counterparty than one in Caithness, because the load is already there and doesn't need relocating.

The honest caveat

Distribution-connected sites are smaller, so each deal is smaller. A 5 MW solar farm supports a far more modest load than a 240 MW wind farm. This is a higher-volume, lower-ticket segment than the transmission Index — which argues for the productised assessment and subscription tiers rather than bespoke work on every site.

Next

If you hold a curtailable connection, you are probably losing money you haven't counted.

Tell us your site and we will pull your own curtailment history from your network operator's published data, total the energy you lost last year, and tell you what a co-located load would have paid for it. No charge for the first look.

info@strandedpower.co See the transmission Index